Site Acquisition & Permitting Process Flow & Guidelines 

  1. Site Hunting Procedures
  2. Conducting Social Acceptability
  3. Requirements for Site Acquisition Reports
  4. Requirements on Securing Pre-Construction Permits
  5. Power Connection Application Requirements
  6. Post Construction Permits Requirements & Energization
  7. Documentation Requirements

RF Design and Optimization Guidelines and Procedures 

  1. RF Design and Planning 
  2. System Design Objectives
  3. Dimensioning
  4. RF Optimization
  5. Drive Testing
  6. Collecting Data in Drive Testing
  7. Network Planning and Optimization Cycle 

Civil Works Implementation Guidelines 

  1. Pre-Implementation Activities
  2. Implementation Works
  3. Site Clearing, Layout & Staking
  4. Earthworks for Tower Foundation
  5. Steel Reinforcement & Formworks Fabrication
  6. Concrete Pouring, Curing & Testing
  7. Backfilling and Shelter or Pad Construction
  8. Tower Erection & Site Development
  9. Site Acceptance & Rectification of Deficiencies

Electrical System Installation Methodology 

  1. Contractor Mobilization
  2. Installation of Electrical & Grounding System
  3. Perimeter Light Installation
  4. OB Light & KWHR Meter Installation
  5. Testing & Acceptance of the Electrical System

Telecom Works Implementation Guidelines 

  1. Pre-Installation Survey
  2. Installation of Telecom Equipment & Accessories
  3. Conducting VSWR & BER Tests
  4. Integration of Site to the Network & Acceptance
  5. Rectification of Outstanding Deficiencies 